Caple C804C Specifiche Pagina 145

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 150
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 144
HPOD C-, X-, Ku-Band High-Power Outdoor Amplifier MN/HPOD.IOM
Appendix C Revision 8
C–3
C.2.2 Install the New Power Supply
To install the new power supply, do these steps:
Step
Task
1
Visually inspect the exposed SSPA heat sink for any debris or blockage. Use compressed air to clean
and clear as needed.
2
Visually inspect both the SSPA and power supply connector for cleanliness or damage. Clean and
correct as required.
3
Inspect the gasket for damage. Replace as required.
4
Install the power supply onto the SSPA. Make sure that the guide pins and connection are properly
aligned. Gently press to engage the connector.
5
Tighten the four captive fasteners where shown previously in Figure C-1.
Be sure to use an appropriate screwdriver, such as the one provided
with the SSPA, to avoid damaging the fasteners.
6
Reconnect the HPOD SSPA to its power source.
Vedere la pagina 144

Commenti su questo manuale

Nessun commento